Planning pack for this site, £295Other options

Battery storage · United Kingdom

Jamesfield Organic Centre, Phase 2

Operator Harmony Energy Storage

Revised19 MWData checked 16 November 2026Source record dated 7 March 2019

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Jamesfield Organic Centre, Phase 2 is a 19 MW battery storage site 10 km south-east of Perth, United Kingdom. Its planning application (18/02336/FLL) went to Perth and Kinross on 9 January 2019. Its status in the Renewable Energy Planning Database (UK government) is revised. There are 25 other energy sites within 10 km, 11 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Jamesfield Organic Centre, Phase 2 sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 329 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool329 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells385 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire522 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
19 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Revised
Operator or applicant
Harmony Energy Storage
Location
Land 140 Metres North East Of, Jamesfield Organic Centre, Newburgh, Cupar, Perth and Kinross, KY14 6EW, United Kingdom
Planning authority
Perth and Kinross
Planning application
18/02336/FLL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 18/02336/FLL, with what the planning evidence pack adds for this site.

Every application in Perth and Kinross · Alerts for applications and incidents near here

  • 9 January 2019 Planning application submitted
  • 30 September 2022 Planning permission expired

None found. The register holds no published incident that names Jamesfield Organic Centre, Phase 2. If you know of one, report it (confidential reports are anonymised).

Has Jamesfield Organic Centre, Phase 2 had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Jamesfield Organic Centre, Phase 2; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Jamesfield Organic Centre, Phase 2?
Revised, in the Renewable Energy Planning Database (UK government), where it last changed on 7 March 2019.
Where is Jamesfield Organic Centre, Phase 2?
10 km south-east of Perth, United Kingdom (postcode KY14 6EW).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).