Battery storage · United Kingdom
Land At Jamesfield Farm Battery Storage (Jamesfield Organic Centre, Phase 1)
Operator Harmony Energy Storage · Owner Harmony Jf Limited
Revised30 MWData checked 16 November 2026Source record dated 26 January 2022
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Land At Jamesfield Farm Battery Storage (Jamesfield Organic Centre, Phase 1) is a 30 MW battery storage site 10 km south-east of Perth, United Kingdom. Its planning application (17/00951/FLL) went to Perth and Kinross on 21 July 2017. Its status in the Renewable Energy Planning Database (UK government) is revised. There are 25 other energy sites within 10 km, 11 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Land At Jamesfield Farm Battery Storage (Jamesfield Organic Centre, Phase 1) changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Outage notices at this site
2 planned or unplanned unavailability notices published under REMIT, 11 Nov 2026. Members see each notice: planned or unplanned, the capacity out, the dates and the cause given.
Contains BMRS data © Elexon Limited copyright and database right. Read each morning; a notice can be withdrawn or revised by the operator.
The company behind this site
HARMONY JF LIMITED (10959382), active, since 2017. 5 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Land At Jamesfield Farm Battery Storage (Jamesfield Organic Centre, Phase 1) sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 329 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0638 | 2020 | Explosion and prolonged fire at Orsted battery storage site in Liverpool | 329 km | Major |
| EIR-0584 | 2026 | Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells | 385 km | Significant |
| EIR-0058 | 2025 | Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire | 522 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Battery storage (Stand-alone Storage)
- Capacity
- 30 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Revised
- Operator or applicant
- Harmony Energy Storage
- Owner
- Harmony Jf Limited
- Location
- Land 140 Metres North East Of, Jamesfield Organic Centre, Newburgh, Cupar, Perth and Kinross, KY14 6EW, United Kingdom
- Planning authority
- Perth and Kinross
- Planning application
- 17/00951/FLL
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 17/00951/FLL, with what the planning evidence pack adds for this site.
Every application in Perth and Kinross · Alerts for applications and incidents near here
Timeline
- 21 July 2017 Planning application submitted
Incidents on the register at this site
None found. The register holds no published incident that names Land At Jamesfield Farm Battery Storage (Jamesfield Organic Centre, Phase 1). If you know of one, report it (confidential reports are anonymised).
Questions
- Has Land At Jamesfield Farm Battery Storage (Jamesfield Organic Centre, Phase 1) had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Land At Jamesfield Farm Battery Storage (Jamesfield Organic Centre, Phase 1); it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Land At Jamesfield Farm Battery Storage (Jamesfield Organic Centre, Phase 1)?
- Revised, in the Renewable Energy Planning Database (UK government), where it last changed on 26 January 2022.
- Where is Land At Jamesfield Farm Battery Storage (Jamesfield Organic Centre, Phase 1)?
- 10 km south-east of Perth, United Kingdom (postcode KY14 6EW).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).