Solar · United Kingdom
Carey Solar Farm
Operator Elgin Energy EsCo
Planning Permission Expired10 MWData checked 16 November 2026Source record dated 2 September 2020
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Carey Solar Farm is a 10 MW solar farm 8.7 km south-east of Perth, United Kingdom. Its planning application (15/01327/FLL) went to Perth and Kinross on 12 August 2015 and was granted on 11 November 2015. Its status in the Renewable Energy Planning Database (UK government) is planning permission expired. There are 28 other energy sites within 10 km, 8 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Carey Solar Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 10 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Planning Permission Expired
- Operator or applicant
- Elgin Energy EsCo
- Location
- Carey Solar Farm, Abernethy, Perth, Tayside, Perth and Kinross, PH2 9LN, United Kingdom
- Planning authority
- Perth and Kinross
- Planning application
- 15/01327/FLL
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 15/01327/FLL, with what the planning evidence pack adds for this site.
Every application in Perth and Kinross · Alerts for applications and incidents near here
Timeline
- 12 August 2015 Planning application submitted
- 11 November 2015 Planning permission granted
- 25 May 2023 Planning permission expired
Incidents on the register at this site
None found. The register holds no published incident that names Carey Solar Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Carey Solar Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Carey Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Carey Solar Farm?
- Planning Permission Expired, in the Renewable Energy Planning Database (UK government), where it last changed on 2 September 2020.
- Where is Carey Solar Farm?
- 8.7 km south-east of Perth, United Kingdom (postcode PH2 9LN).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).