Battery storage · United Kingdom
Lime Lane, Pelsall - Battery Energy Storage System
Operator Elgin Energy Esco Limited
Application Refused100 MWData checked 16 November 2026Source record dated 23 June 2026
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Lime Lane, Pelsall - Battery Energy Storage System is a 100 MW battery storage site on the edge of Norton Canes, West Midlands, United Kingdom. Its planning application (CH/25/0225) went to Cannock Chase on 23 July 2025 and was refused on 28 May 2026. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 39 other energy sites within 10 km, 14 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Lime Lane, Pelsall - Battery Energy Storage System changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Battery storage (Stand-alone Storage)
- Capacity
- 100 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Refused (Planning Permission Refused)
- Operator or applicant
- Elgin Energy Esco Limited
- Location
- The rear of the Bungalow, Lime Lane, Pelsall, West Midlands, WS3 5AL, United Kingdom
- Planning authority
- Cannock Chase
- Planning application
- CH/25/0225
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for CH/25/0225, with what the planning evidence pack adds for this site.
Every application in Cannock Chase · Alerts for applications and incidents near here
Timeline
- 23 July 2025 Planning application submitted
- 28 May 2026 Planning permission refused
Incidents on the register at this site
None found. The register holds no published incident that names Lime Lane, Pelsall - Battery Energy Storage System. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Lime Lane, Pelsall - Battery Energy Storage System had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Lime Lane, Pelsall - Battery Energy Storage System; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Lime Lane, Pelsall - Battery Energy Storage System?
- Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 23 June 2026.
- Where is Lime Lane, Pelsall - Battery Energy Storage System?
- On the edge of Norton Canes, West Midlands, United Kingdom (postcode WS3 5AL).