Solar · United Kingdom
Finning Limited, Watling Street - Solar Farm
Operator Finning (UK) Limited Head Office
Application SubmittedData checked 16 November 2026Source record dated 4 August 2023
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Finning Limited, Watling Street - Solar Farm is a solar farm on the edge of Cannock, Staffordshire, United Kingdom. Its planning application (CH/23/0224) went to Cannock Chase on 13 July 2023. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 50 other energy sites within 10 km, 24 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Finning Limited, Watling Street - Solar Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Finning Limited, Watling Street - Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1272, Fire in solar panel distribution board at Birmingham college, 26 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1272 | 2022 | Fire in solar panel distribution board at Birmingham college | 26 km | Minor |
| EIR-0172 | 2026 | Fire at Wheat Leasows solar farm in Telford involves an electricity pylon | 29 km | Minor |
| EIR-1553 | 2017 | Roof fire involving 14 solar panels attended in Shropshire | 40 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Status
- Application Submitted (Planning Application Submitted)
- Operator or applicant
- Finning (UK) Limited Head Office
- Location
- Finning Limited, Watling Street, Staffordshire, WS11 1SL, United Kingdom
- Planning authority
- Cannock Chase
- Planning application
- CH/23/0224
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for CH/23/0224, with what the planning evidence pack adds for this site.
Every application in Cannock Chase · Alerts for applications and incidents near here
Timeline
- 13 July 2023 Planning application submitted
Incidents on the register at this site
None found. The register holds no published incident that names Finning Limited, Watling Street - Solar Farm. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Finning Limited, Watling Street - Solar Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Finning Limited, Watling Street - Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Finning Limited, Watling Street - Solar Farm?
- Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 4 August 2023.
- Where is Finning Limited, Watling Street - Solar Farm?
- On the edge of Cannock, Staffordshire, United Kingdom (postcode WS11 1SL).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).