Battery storage · United Kingdom

Upper Latherford Farm, Latherford Lane - Battery Energy Storage System

Operator Net Zero Twelve Limited

Awaiting Construction50 MWData checked 16 November 2026Source record dated 4 November 2024

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Upper Latherford Farm, Latherford Lane - Battery Energy Storage System is a 50 MW battery storage site on the edge of Featherstone, West Midlands, United Kingdom. Its planning application (23/00883/FUL) went to South Staffordshire on 3 November 2023 and was granted on 16 October 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 61 other energy sites within 10 km, 19 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Upper Latherford Farm, Latherford Lane - Battery Energy Storage System sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 83 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells83 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool98 kmMajor
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire106 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
50 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Net Zero Twelve Limited
Location
Upper Latherford Farm Latherford Lane Latherford, West Midlands, WV10 7DX, United Kingdom
Planning authority
South Staffordshire
Planning application
23/00883/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 23/00883/FUL, with what the planning evidence pack adds for this site.

Every application in South Staffordshire · Alerts for applications and incidents near here

  • 3 November 2023 Planning application submitted
  • 16 October 2024 Planning permission granted

None found. The register holds no published incident that names Upper Latherford Farm, Latherford Lane - Battery Energy Storage System. If you know of one, report it (confidential reports are anonymised).

Has Upper Latherford Farm, Latherford Lane - Battery Energy Storage System had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Upper Latherford Farm, Latherford Lane - Battery Energy Storage System; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Upper Latherford Farm, Latherford Lane - Battery Energy Storage System?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 4 November 2024.
Where is Upper Latherford Farm, Latherford Lane - Battery Energy Storage System?
On the edge of Featherstone, West Midlands, United Kingdom (postcode WV10 7DX).