Battery storage · United Kingdom
Upper Latherford Farm, Latherford Lane - Battery Energy Storage System
Operator Net Zero Twelve Limited
Awaiting Construction50 MWData checked 16 November 2026Source record dated 4 November 2024
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Upper Latherford Farm, Latherford Lane - Battery Energy Storage System is a 50 MW battery storage site on the edge of Featherstone, West Midlands, United Kingdom. Its planning application (23/00883/FUL) went to South Staffordshire on 3 November 2023 and was granted on 16 October 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 61 other energy sites within 10 km, 19 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Upper Latherford Farm, Latherford Lane - Battery Energy Storage System changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Upper Latherford Farm, Latherford Lane - Battery Energy Storage System sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 83 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0584 | 2026 | Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells | 83 km | Significant |
| EIR-0638 | 2020 | Explosion and prolonged fire at Orsted battery storage site in Liverpool | 98 km | Major |
| EIR-0058 | 2025 | Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire | 106 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Battery storage (Stand-alone Storage)
- Capacity
- 50 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Net Zero Twelve Limited
- Location
- Upper Latherford Farm Latherford Lane Latherford, West Midlands, WV10 7DX, United Kingdom
- Planning authority
- South Staffordshire
- Planning application
- 23/00883/FUL
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 23/00883/FUL, with what the planning evidence pack adds for this site.
Every application in South Staffordshire · Alerts for applications and incidents near here
Timeline
- 3 November 2023 Planning application submitted
- 16 October 2024 Planning permission granted
Incidents on the register at this site
None found. The register holds no published incident that names Upper Latherford Farm, Latherford Lane - Battery Energy Storage System. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Upper Latherford Farm, Latherford Lane - Battery Energy Storage System had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Upper Latherford Farm, Latherford Lane - Battery Energy Storage System; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Upper Latherford Farm, Latherford Lane - Battery Energy Storage System?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 4 November 2024.
- Where is Upper Latherford Farm, Latherford Lane - Battery Energy Storage System?
- On the edge of Featherstone, West Midlands, United Kingdom (postcode WV10 7DX).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).