Planning pack for this site, £295Other options

Solar · United Kingdom

Four Ashes, Deepmore Lane - Solar Farm

Operator Renewable Connections

Awaiting Construction22.5 MWData checked 16 November 2026Source record dated 6 August 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Four Ashes, Deepmore Lane - Solar Farm is a 22.5 MW solar farm 3.7 km north-west of Featherstone, West Midlands, United Kingdom. Its planning application (23/00931/FULM) went to South Staffordshire on 31 October 2023 and was granted on 17 July 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 58 other energy sites within 10 km, 30 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

RENEWABLE CONNECTIONS LLP (OC428894), dissolved, since 2019. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Four Ashes, Deepmore Lane - Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-0172, Fire at Wheat Leasows solar farm in Telford involves an electricity pylon, 24 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-01722026Fire at Wheat Leasows solar farm in Telford involves an electricity pylon24 kmMinor
EIR-12722022Fire in solar panel distribution board at Birmingham college29 kmMinor
EIR-15472025Small fire within a solar panel at a house in Shropshire35 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
22.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Renewable Connections
Location
S/O Four Ashes, Deepmore Lane, Coven, Wolverhampton, West Midlands, WV10 7ED, United Kingdom
Planning authority
South Staffordshire
Planning application
23/00931/FULM

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 23/00931/FULM, with what the planning evidence pack adds for this site.

Every application in South Staffordshire · Alerts for applications and incidents near here

  • 31 October 2023 Planning application submitted
  • 17 July 2024 Planning permission granted
  • 17 July 2027 Planning permission runs out

None found. The register holds no published incident that names Four Ashes, Deepmore Lane - Solar Farm. If you know of one, report it (confidential reports are anonymised).

Has Four Ashes, Deepmore Lane - Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Four Ashes, Deepmore Lane - Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Four Ashes, Deepmore Lane - Solar Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 6 August 2024.
Where is Four Ashes, Deepmore Lane - Solar Farm?
3.7 km north-west of Featherstone, West Midlands, United Kingdom (postcode WV10 7ED).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).