Battery storage · United Kingdom

Stocking Pelham - Battery Storage System

Operator Renewable Connections

Application Refused50 MWData checked 16 November 2026Source record dated 15 June 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Stocking Pelham - Battery Storage System is a 50 MW battery storage site 7.2 km north-west of Stansted Mountfitchet, Hertfordshire, United Kingdom. Its planning application (3/22/0806/FUL) went to East Hertfordshire on 27 April 2022 and was refused on 30 June 2025. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 32 other energy sites within 10 km, 13 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

The operator's 6 other sites and 447 energy sites within 40 km for Stocking Pelham - Battery Storage System

Members see the sites and incidents around this one, and every record behind them.

RENEWABLE CONNECTIONS LLP (OC428894), dissolved, since 2019. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Battery storage (Stand-alone Storage)
Capacity
50 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Refused (Planning Permission Refused)
Operator or applicant
Renewable Connections
Location
Crabbs Lane And Pelham Substation Stocking Pelham, Hertfordshire, SG9, United Kingdom
Planning authority
East Hertfordshire
Planning application
3/22/0806/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 3/22/0806/FUL, with what the planning evidence pack adds for this site.

Every application in East Hertfordshire · Alerts for applications and incidents near here

  • 27 April 2022 Planning application submitted
  • 30 June 2025 Planning permission refused

None found. The register holds no published incident that names Stocking Pelham - Battery Storage System. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Stocking Pelham - Battery Storage System had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Stocking Pelham - Battery Storage System; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Stocking Pelham - Battery Storage System?
Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 15 June 2026.
Where is Stocking Pelham - Battery Storage System?
7.2 km north-west of Stansted Mountfitchet, Hertfordshire, United Kingdom (postcode SG9).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).