← Back to Cambridgeshire

Energy sites / United Kingdom / Cambridgeshire

Solar · United Kingdom

Treading Bank Solar Farm

Application Refused49.9 MWChecked 6 October 2026Last changed in the dataset 16 December 2025

Technology
Solar
Capacity
49.9 MW
Status
Application Refused (Planning Permission Refused)
Operator or applicant
Renewable Connections
Location
Sw/O Treading Bank, Tydd St Giles, Wisbech, Cambridgeshire, PE13 5LE, United Kingdom
Planning authority
Fenland
Planning application
F/YR25/0758/F

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

  • 13 October 2025 Planning application submitted
  • 4 December 2025 Planning permission refused

None found. The register holds no published incident that names Treading Bank Solar Farm. If you know of one, report it (confidential reports are anonymised).

The register holds 86 incidents at solar farms in the United Kingdom, 59 of them fires, and 344 worldwide. Counts of incidents in published reporting, not rates.

What fails at solar farms · All solar farms incidents

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.