Solar · United Kingdom
Grange Farm (Lincolnshire)
Operator Green Switch Solutions
Operational12.7 MWData checked 16 November 2026Source record dated 15 June 2015
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Grange Farm (Lincolnshire) is a 12.7 MW solar farm 6.9 km south of Holbeach, Lincolnshire, United Kingdom. Its planning application (H20-0937-13) went to South Holland on 1 November 2013 and was granted on 19 March 2014. It has been operating since 30 March 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 40 other energy sites within 10 km, 18 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Grange Farm (Lincolnshire) changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 12.7 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Green Switch Solutions
- Location
- Grange Farm, Fishergate, Sutton St James, Spalding, Lincs, Lincolnshire, PE12 0EZ, United Kingdom
- Planning authority
- South Holland
- Planning application
- H20-0937-13
- First operating
- 2015
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for H20-0937-13, with what the planning evidence pack adds for this site.
Every application in South Holland · Alerts for applications and incidents near here
Timeline
- 1 November 2013 Planning application submitted
- 19 March 2014 Planning permission granted
- 1 October 2014 Construction started
- 30 March 2015 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Grange Farm (Lincolnshire). If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Grange Farm (Lincolnshire) had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Grange Farm (Lincolnshire); it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Grange Farm (Lincolnshire)?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 15 June 2015.
- Where is Grange Farm (Lincolnshire)?
- 6.9 km south of Holbeach, Lincolnshire, United Kingdom (postcode PE12 0EZ).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).