Solar · United Kingdom
Land at Rectory Farm
Operator Green Switch Solutions
Application Withdrawn8.9 MWData checked 16 November 2026Source record dated 9 February 2015
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Land at Rectory Farm is a 8.9 MW solar farm 3.7 km south-west of Bromsgrove, Hereford and Worcester, United Kingdom. Its planning application (14/02267) went to Wychavon on 8 September 2014 and was withdrawn on 26 January 2015. Its status in the Renewable Energy Planning Database (UK government) is application withdrawn. There are 25 other energy sites within 10 km, 14 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Land at Rectory Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 8.9 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Withdrawn (Planning Application Withdrawn)
- Operator or applicant
- Green Switch Solutions
- Location
- Rectory Farm, Rectory Lane, Upton Warren, Bromsgrove, Hereford and Worcester, B61 7EL, United Kingdom
- Planning authority
- Wychavon
- Planning application
- 14/02267
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 14/02267, with what the planning evidence pack adds for this site.
Every application in Wychavon · Alerts for applications and incidents near here
Timeline
- 8 September 2014 Planning application submitted
- 26 January 2015 Application withdrawn
Incidents on the register at this site
None found. The register holds no published incident that names Land at Rectory Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Land at Rectory Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Land at Rectory Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Land at Rectory Farm?
- Application Withdrawn, in the Renewable Energy Planning Database (UK government), where it last changed on 9 February 2015.
- Where is Land at Rectory Farm?
- 3.7 km south-west of Bromsgrove, Hereford and Worcester, United Kingdom (postcode B61 7EL).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).