Hurst Hall

Operator Green Switch Solutions

Appeal Refused13.3 MWData checked 16 November 2026Source record dated 3 March 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Hurst Hall is a 13.3 MW solar farm 5.8 km north-east of Whitchurch, Cheshire, United Kingdom. Its planning application (14/4380N) went to Cheshire East on 22 September 2014 and was refused on appeal on 12 February 2016. Its status in the Renewable Energy Planning Database (UK government) is appeal refused. There are 14 other energy sites within 10 km, 12 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 10 other sites and 402 energy sites within 40 km for Hurst Hall

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
13.3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Appeal Refused
Operator or applicant
Green Switch Solutions
Location
Hurst Hall, Wrenbury Road, Marbury, Cheshire, Cheshire, SY13 4LU, United Kingdom
Planning authority
Cheshire East
Planning application
14/4380N
Appeal reference
APP/R0660/W/15/3011357

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 14/4380N, with what the planning evidence pack adds for this site.

Every application in Cheshire East · Alerts for applications and incidents near here

  • 22 September 2014 Planning application submitted
  • 11 December 2014 Planning permission refused
  • 4 June 2015 Appeal lodged
  • 12 February 2016 Appeal refused

None found. The register holds no published incident that names Hurst Hall. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Hurst Hall had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Hurst Hall; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Hurst Hall?
Appeal Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 3 March 2016.
Where is Hurst Hall?
5.8 km north-east of Whitchurch, Cheshire, United Kingdom (postcode SY13 4LU).