Planning pack for this site, £295Other options

Solar · United Kingdom

Berden Hall Solar Farm

Operator British Solar Renewables · Owner Owl Investment Bidco Limited

Awaiting Construction56 MWData checked 16 November 2026Source record dated 12 June 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Berden Hall Solar Farm is a 56 MW solar farm 6.3 km north-west of Stansted Mountfitchet, Hertfordshire, United Kingdom. Its planning application (UTT/22/2046/PINS) went to Uttlesford on 4 August 2022 and was granted on 18 July 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 31 other energy sites within 10 km, 17 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

BRITISH SOLAR RENEWABLES LIMITED (07315867), active, since 2010. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Berden Hall Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1262, Fire reported on solar-panel roof at Fitzwilliam College auditorium, 29 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12622024Fire reported on solar-panel roof at Fitzwilliam College auditorium29 kmMinor
EIR-15142024Garage fire destroys solar panels in Southgate, with a battery storage fault suspected38 kmMinor
EIR-14932026Solar panels catch fire on Bedford warehouse roof44 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
56 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
British Solar Renewables
Owner
Owl Investment Bidco Limited
Location
Dewes Green Road, Berden, Bishops Stortford, Hertfordshire, CM23 1BA, United Kingdom
Planning authority
Uttlesford
Planning application
UTT/22/2046/PINS

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for UTT/22/2046/PINS, with what the planning evidence pack adds for this site.

Every application in Uttlesford · Alerts for applications and incidents near here

  • 4 August 2022 Planning application submitted
  • 18 July 2024 Planning permission granted
  • 18 July 2027 Planning permission runs out

None found. The register holds no published incident that names Berden Hall Solar Farm. If you know of one, report it (confidential reports are anonymised).

Has Berden Hall Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Berden Hall Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Berden Hall Solar Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 12 June 2026.
Where is Berden Hall Solar Farm?
6.3 km north-west of Stansted Mountfitchet, Hertfordshire, United Kingdom (postcode CM23 1BA).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).