Planning pack for this site, £295Other options

Battery storage · United Kingdom

Lions Den, Hammerwich - Battery Storage Facility

Operator Elgin Energy Services Limited

Awaiting Construction100 MWData checked 16 November 2026Source record dated 5 August 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Lions Den, Hammerwich - Battery Storage Facility is a 100 MW battery storage site on the edge of Chasetown, Staffordshire, United Kingdom. Its planning application (24/01169/FULM) went to Lichfield on 19 December 2024 and was granted on 24 July 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 21 other energy sites within 10 km, 5 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Lions Den, Hammerwich - Battery Storage Facility sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 73 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells73 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire106 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool106 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
100 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Elgin Energy Services Limited
Location
N/O A5 Lions Den, Hammerwich, Burntwood, Staffordshire, WS14 0BE, United Kingdom
Planning authority
Lichfield
Planning application
24/01169/FULM

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 24/01169/FULM, with what the planning evidence pack adds for this site.

Every application in Lichfield · Alerts for applications and incidents near here

  • 19 December 2024 Planning application submitted
  • 24 July 2025 Planning permission granted
  • 24 July 2028 Planning permission runs out

None found. The register holds no published incident that names Lions Den, Hammerwich - Battery Storage Facility. If you know of one, report it (confidential reports are anonymised).

Has Lions Den, Hammerwich - Battery Storage Facility had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Lions Den, Hammerwich - Battery Storage Facility; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Lions Den, Hammerwich - Battery Storage Facility?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 5 August 2025.
Where is Lions Den, Hammerwich - Battery Storage Facility?
On the edge of Chasetown, Staffordshire, United Kingdom (postcode WS14 0BE).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).