← Back to Somerset
Planning pack for this site, £295Other options

Solar · United Kingdom

Nythe Road, Pedwell - Solar Photovoltaic Park

Operator Elgin Energy Services Limited

Application Submitted40 MWData checked 16 November 2026Source record dated 29 August 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Nythe Road, Pedwell - Solar Photovoltaic Park is a 40 MW solar farm 5.6 km west of Street, Somerset, United Kingdom. Its planning application (2025/1289/FUL) went to Somerset on 22 July 2025. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 15 other energy sites within 10 km, 13 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Nythe Road, Pedwell - Solar Photovoltaic Park sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1453, Fire crews tackle solar panel unit blaze in Burnham-On-Sea, 17 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14532026Fire crews tackle solar panel unit blaze in Burnham-On-Sea17 kmMinor
EIR-15262025Solar panels catch fire on a retail or public building roof in South Petherton19 kmMinor
EIR-15242025Fire at a solar PV equipped house in Stoney Stratton23 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
40 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Submitted (Planning Application Submitted)
Operator or applicant
Elgin Energy Services Limited
Location
Nythe Road, Pedwell, Bridgwater, Somerset, TA7 9BG, United Kingdom
Planning authority
Somerset
Planning application
2025/1289/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 2025/1289/FUL, with what the planning evidence pack adds for this site.

Every application in Somerset · Alerts for applications and incidents near here

  • 22 July 2025 Planning application submitted

None found. The register holds no published incident that names Nythe Road, Pedwell - Solar Photovoltaic Park. If you know of one, report it (confidential reports are anonymised).

Has Nythe Road, Pedwell - Solar Photovoltaic Park had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Nythe Road, Pedwell - Solar Photovoltaic Park; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Nythe Road, Pedwell - Solar Photovoltaic Park?
Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 29 August 2025.
Where is Nythe Road, Pedwell - Solar Photovoltaic Park?
5.6 km west of Street, Somerset, United Kingdom (postcode TA7 9BG).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).