Planning pack for this site, £295Other options

Solar · United Kingdom

Steel Processing Midlands, Burntwood Business Park - Solar Panels

Operator Steel Processing Midlands Limited

Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 12 March 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Steel Processing Midlands, Burntwood Business Park - Solar Panels is a 0.2 MW solar farm in Burntwood, Staffordshire, United Kingdom. Its planning application (23/01426/PNPV) went to Lichfield on 3 January 2024 and was granted on 8 March 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 24 other energy sites within 10 km, 13 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Steel Processing Midlands, Burntwood Business Park - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1272, Fire in solar panel distribution board at Birmingham college, 23 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12722022Fire in solar panel distribution board at Birmingham college23 kmMinor
EIR-01722026Fire at Wheat Leasows solar farm in Telford involves an electricity pylon36 kmMinor
EIR-15462025Solar panel isolation switch overheats in roof fire at a house in Bucknall41 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Steel Processing Midlands Limited
Location
Unit 14, Zone 4, Steel Processing (Midlands) Limited, Burntwood Business Park, Milestone Way, Burntwood, Staffordshire, WS7 3XD, United Kingdom
Planning authority
Lichfield
Planning application
23/01426/PNPV

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 23/01426/PNPV, with what the planning evidence pack adds for this site.

Every application in Lichfield · Alerts for applications and incidents near here

  • 3 January 2024 Planning application submitted
  • 8 March 2024 Planning permission granted

None found. The register holds no published incident that names Steel Processing Midlands, Burntwood Business Park - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Steel Processing Midlands, Burntwood Business Park - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Steel Processing Midlands, Burntwood Business Park - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Steel Processing Midlands, Burntwood Business Park - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 12 March 2024.
Where is Steel Processing Midlands, Burntwood Business Park - Solar Panels?
In Burntwood, Staffordshire, United Kingdom (postcode WS7 3XD).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).