Planning pack for this site, £295Other options

Solar · United Kingdom

Highfields Farm, Clifton Lane - Solar Panels

Operator Elgin Energy ESCO Limited

Under Construction61.9 MWData checked 16 November 2026Source record dated 13 July 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Highfields Farm, Clifton Lane - Solar Panels is a 61.9 MW solar farm 5.7 km north-east of Tamworth, Staffordshire, United Kingdom. Its planning application (22/00110/FULM) went to Lichfield on 17 January 2022 and was granted on 11 July 2023. Construction started on 1 June 2026. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 31 other energy sites within 10 km, 21 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Highfields Farm, Clifton Lane - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1272, Fire in solar panel distribution board at Birmingham college, 26 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12722022Fire in solar panel distribution board at Birmingham college26 kmMinor
EIR-21512018Sunlight reflected from a shed solar panel believed to have started a house fire in Thurnby Lodge40 kmSignificant
EIR-15542026Fire involving solar panels at a Market Harborough house spreads to an adjoining property52 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
61.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Under Construction
Operator or applicant
Elgin Energy ESCO Limited
Location
Highfields Farm Clifton Lane Tamworth, Staffordshire, B79 0AQ, United Kingdom
Planning authority
Lichfield
Planning application
22/00110/FULM

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 22/00110/FULM, with what the planning evidence pack adds for this site.

Every application in Lichfield · Alerts for applications and incidents near here

  • 17 January 2022 Planning application submitted
  • 11 July 2023 Planning permission granted
  • 1 June 2026 Construction started

None found. The register holds no published incident that names Highfields Farm, Clifton Lane - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Highfields Farm, Clifton Lane - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Highfields Farm, Clifton Lane - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Highfields Farm, Clifton Lane - Solar Panels?
Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 13 July 2026.
Where is Highfields Farm, Clifton Lane - Solar Panels?
5.7 km north-east of Tamworth, Staffordshire, United Kingdom (postcode B79 0AQ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).