Solar · United Kingdom
Clifton Marsh Farm, Preston New Road - Solar Farm
Operator Vattenfall
Awaiting Construction49.9 MWData checked 16 November 2026Source record dated 25 August 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Clifton Marsh Farm, Preston New Road - Solar Farm is a 49.9 MW solar farm 3.1 km east of Freckleton, Lancashire, United Kingdom. Its planning application (24/0414) went to Fylde on 22 July 2024 and was granted on 4 August 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 33 other energy sites within 10 km, 22 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Clifton Marsh Farm, Preston New Road - Solar Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Clifton Marsh Farm, Preston New Road - Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1244, Fire reported to have started in solar panels at Westleigh primary school, 35 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1244 | 2018 | Fire reported to have started in solar panels at Westleigh primary school | 35 km | Significant |
| EIR-2771 | 2024 | Fire involves rooftop solar panels and lithium batteries on Bradford house roof | 71 km | Minor |
| EIR-1485 | 2026 | Faulty solar panel wiring sparks house fire in Stoke-on-Trent | 88 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 49.9 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Vattenfall
- Location
- Clifton Marsh Farm, Preston New Road, Newton With Clifton, Preston, Lancashire, PR4 0XE, United Kingdom
- Planning authority
- Fylde
- Planning application
- 24/0414
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 24/0414, with what the planning evidence pack adds for this site.
Every application in Fylde · Alerts for applications and incidents near here
Status changed from Application Submitted to Awaiting Construction on 16 November 2026.
Timeline
- 22 July 2024 Planning application submitted
- 4 August 2026 Planning permission granted
- 4 August 2029 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Clifton Marsh Farm, Preston New Road - Solar Farm. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Clifton Marsh Farm, Preston New Road - Solar Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Clifton Marsh Farm, Preston New Road - Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Clifton Marsh Farm, Preston New Road - Solar Farm?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 16 November 2026.
- Where is Clifton Marsh Farm, Preston New Road - Solar Farm?
- 3.1 km east of Freckleton, Lancashire, United Kingdom (postcode PR4 0XE).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).