Solar · United Kingdom
Clifton Marsh Wwtw
Operator United Utilities
Application Refused4.5 MWData checked 16 November 2026Source record dated 30 January 2017
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Clifton Marsh Wwtw is a 4.5 MW solar farm on the edge of Freckleton, Lancashire, United Kingdom. Its planning application (LCC/2016/0007) went to Fylde on 22 January 2016 and was refused on 20 January 2017. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 37 other energy sites within 10 km, 25 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Clifton Marsh Wwtw changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The company behind this site
UNITED UTILITIES PLC (02366616), active, since 1989. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
The site
- Technology
- Solar
- Capacity
- 4.5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Refused (Planning Permission Refused)
- Operator or applicant
- United Utilities
- Location
- Clifton Marsh Wwtw, Preston New Road, Freckleton, Preston, Lancashire, PR4 1HN, United Kingdom
- Planning authority
- Fylde
- Planning application
- LCC/2016/0007
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for LCC/2016/0007, with what the planning evidence pack adds for this site.
Every application in Fylde · Alerts for applications and incidents near here
Timeline
- 22 January 2016 Planning application submitted
- 20 January 2017 Planning permission refused
Incidents on the register at this site
None found. The register holds no published incident that names Clifton Marsh Wwtw. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Clifton Marsh Wwtw had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Clifton Marsh Wwtw; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Clifton Marsh Wwtw?
- Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 30 January 2017.
- Where is Clifton Marsh Wwtw?
- On the edge of Freckleton, Lancashire, United Kingdom (postcode PR4 1HN).