Huntington Water Treatment Works

Operator United Utilities

Operational7.2 MWData checked 16 November 2026Source record dated 27 September 2019

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Huntington Water Treatment Works is a 7.2 MW solar farm on the edge of Chester, Cheshire, United Kingdom. Its planning application (17/05078/FUL) went to Cheshire West and Chester on 28 November 2017 and was granted on 24 April 2018. It has been operating since 24 July 2019. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 34 other energy sites within 10 km, 28 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 7 other sites and 447 energy sites within 40 km for Huntington Water Treatment Works

Members see the sites and incidents around this one, and every record behind them.

UNITED UTILITIES PLC (02366616), active, since 1989. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
7.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
United Utilities
Location
Huntington Water Treatment Wor, Chester Road, Huntington, Chester, Cheshire, CH3 6EA, United Kingdom
Planning authority
Cheshire West and Chester
Planning application
17/05078/FUL
First operating
2019

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 17/05078/FUL, with what the planning evidence pack adds for this site.

Every application in Cheshire West and Chester · Alerts for applications and incidents near here

  • 28 November 2017 Planning application submitted
  • 24 April 2018 Planning permission granted
  • 15 February 2019 Construction started
  • 24 July 2019 Operational

None found. The register holds no published incident that names Huntington Water Treatment Works. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Huntington Water Treatment Works had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Huntington Water Treatment Works; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Huntington Water Treatment Works?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 27 September 2019.
Where is Huntington Water Treatment Works?
On the edge of Chester, Cheshire, United Kingdom (postcode CH3 6EA).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).