Portmanmoor Road Industrial Estate, Splott - Battery Storage Units

Operator Infinis Energy Services Limited · Owner Infinis Energy Management Limited

Awaiting Construction10 MWData checked 16 November 2026Source record dated 12 August 2024

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Portmanmoor Road Industrial Estate, Splott - Battery Storage Units is a 10 MW battery storage site 3.5 km north-east of Chester, Cheshire, United Kingdom. Its planning application (24/00935/FUL) went to Cheshire West and Chester on 23 April 2024 and was granted on 22 July 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 46 other energy sites within 10 km, 14 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

INFINIS ENERGY SERVICES LIMITED (07166617), active, since 2010. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Portmanmoor Road Industrial Estate, Splott - Battery Storage Units sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 22 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool22 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells115 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire177 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
10 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Infinis Energy Services Limited
Owner
Infinis Energy Management Limited
Location
Adj To Electricity Substation, The A55 At Bellevue Lane, Guilden Sutton, Chester, Cheshire, CH3 7EZ, United Kingdom
Planning authority
Cheshire West and Chester
Planning application
24/00935/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 24/00935/FUL, with what the planning evidence pack adds for this site.

Every application in Cheshire West and Chester · Alerts for applications and incidents near here

  • 23 April 2024 Planning application submitted
  • 22 July 2024 Planning permission granted
  • 22 July 2029 Planning permission runs out

None found. The register holds no published incident that names Portmanmoor Road Industrial Estate, Splott - Battery Storage Units. If you know of one, report it (confidential reports are anonymised).

Has Portmanmoor Road Industrial Estate, Splott - Battery Storage Units had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Portmanmoor Road Industrial Estate, Splott - Battery Storage Units; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Portmanmoor Road Industrial Estate, Splott - Battery Storage Units?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 12 August 2024.
Where is Portmanmoor Road Industrial Estate, Splott - Battery Storage Units?
3.5 km north-east of Chester, Cheshire, United Kingdom (postcode CH3 7EZ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).