← Back to Bedfordshire

Battery storage · United Kingdom

AGCLHS (Clayhill)

Operator Anesco · Owner Clayhill Solar Limited

Operational6 MWData checked 16 November 2026Source record dated 24 June 2016

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

AGCLHS (Clayhill) is a 6 MW battery storage site on the edge of Flitwick, Bedfordshire, United Kingdom. Its planning application (CB/14/03419/FULL) went to Central Bedfordshire on 1 September 2014 and was granted on 28 January 2015. It has been operating since 24 June 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 41 other energy sites within 10 km, 23 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

The operator's 63 other sites and 619 energy sites within 40 km for AGCLHS (Clayhill)

Members see the sites and incidents around this one, and every record behind them.

ANESCO LIMITED (07443091), active, since 2010. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Battery storage (Co-located with RE)
Capacity
6 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Anesco
Owner
Clayhill Solar Limited
Location
North Clayhill Farm, Greenfield Road, Westoning, Bedford, Bedfordshire, Bedfordshire, MK45 5JD, United Kingdom
Planning authority
Central Bedfordshire
Planning application
CB/14/03419/FULL
First operating
2016

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for CB/14/03419/FULL, with what the planning evidence pack adds for this site.

Every application in Central Bedfordshire · Alerts for applications and incidents near here

  • 1 September 2014 Planning application submitted
  • 28 January 2015 Planning permission granted
  • 24 April 2016 Construction started
  • 24 June 2016 Operational

None found. The register holds no published incident that names AGCLHS (Clayhill). If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has AGCLHS (Clayhill) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names AGCLHS (Clayhill); it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of AGCLHS (Clayhill)?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 24 June 2016.
Where is AGCLHS (Clayhill)?
On the edge of Flitwick, Bedfordshire, United Kingdom (postcode MK45 5JD).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).