← Back to Bedfordshire
Planning pack for this site, £295Other options

Battery storage · United Kingdom

Clayhill Farm, Greenfield Road - Battery Energy Storage

Operator Conrad Energy (Developments) Limited · Owner ARL O09 Limited

Awaiting Construction20 MWData checked 16 November 2026Source record dated 14 January 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Clayhill Farm, Greenfield Road - Battery Energy Storage is a 20 MW battery storage site on the edge of Flitwick, Bedfordshire, United Kingdom. Its planning application (CB/24/02825/FULL) went to Central Bedfordshire on 1 October 2024 and was granted on 18 December 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 46 other energy sites within 10 km, 23 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

CONRAD ENERGY (DEVELOPMENTS) LIMITED (11105940), active, since 2017. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Clayhill Farm, Greenfield Road - Battery Energy Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0109, Fire in single battery unit at Thurrock BESS under construction, 84 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-01092025Fire in single battery unit at Thurrock BESS under construction84 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire103 kmSignificant
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells133 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
20 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Conrad Energy (Developments) Limited
Owner
ARL O09 Limited
Location
North Of Clayhill Farm, Greenfield Road, Westoning, Bedfordshire, MK45 5JD, United Kingdom
Planning authority
Central Bedfordshire
Planning application
CB/24/02825/FULL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for CB/24/02825/FULL, with what the planning evidence pack adds for this site.

Every application in Central Bedfordshire · Alerts for applications and incidents near here

  • 1 October 2024 Planning application submitted
  • 18 December 2024 Planning permission granted
  • 18 December 2027 Planning permission runs out

None found. The register holds no published incident that names Clayhill Farm, Greenfield Road - Battery Energy Storage. If you know of one, report it (confidential reports are anonymised).

Has Clayhill Farm, Greenfield Road - Battery Energy Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Clayhill Farm, Greenfield Road - Battery Energy Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Clayhill Farm, Greenfield Road - Battery Energy Storage?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 14 January 2025.
Where is Clayhill Farm, Greenfield Road - Battery Energy Storage?
On the edge of Flitwick, Bedfordshire, United Kingdom (postcode MK45 5JD).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).