Clayhill Farm - Battery Energy Storage is a 21 MW battery storage site on the edge of Flitwick, Bedfordshire, United Kingdom. Its planning application (CB/17/06006/FULL) went to Central Bedfordshire on 19 December 2017 and was granted on 23 March 2018. It has been operating since 1 October 2019. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 44 other energy sites within 10 km, 23 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

The operator's 16 other sites and 619 energy sites within 40 km for Clayhill Farm - Battery Energy Storage

Members see the sites and incidents around this one, and every record behind them.

ENSO ENERGY LIMITED (09892057), active, since 2015. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Battery storage (Stand-alone Storage)
Capacity
21 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Enso Energy Limited
Owner
Priory Energy Limited
Location
Land at Clayhill Farm, Greenfield Road, Westoning, Bedford, Bedfordshire, MK45 5JD, United Kingdom
Planning authority
Central Bedfordshire
Planning application
CB/17/06006/FULL
First operating
2019

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for CB/17/06006/FULL, with what the planning evidence pack adds for this site.

Every application in Central Bedfordshire · Alerts for applications and incidents near here

  • 19 December 2017 Planning application submitted
  • 23 March 2018 Planning permission granted
  • 1 May 2019 Construction started
  • 1 October 2019 Operational

None found. The register holds no published incident that names Clayhill Farm - Battery Energy Storage. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Clayhill Farm - Battery Energy Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Clayhill Farm - Battery Energy Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Clayhill Farm - Battery Energy Storage?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 14 September 2022.
Where is Clayhill Farm - Battery Energy Storage?
On the edge of Flitwick, Bedfordshire, United Kingdom (postcode MK45 5JD).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).