Tuxford Road Solar Farm
Operator Enso Energy Limited · Owner Priory Energy Limited
Awaiting Construction49.9 MWData checked 16 November 2026Source record dated 6 April 2022
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Tuxford Road Solar Farm is a 49.9 MW solar farm 9.2 km north of Newark on Trent, Nottinghamshire, United Kingdom. Its planning application (21/01577/FULM) went to Newark and Sherwood on 16 July 2021 and was granted on 16 December 2021. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 38 other energy sites within 10 km, 19 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Tuxford Road Solar Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
ENSO ENERGY LIMITED (09892057), active, since 2015. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Tuxford Road Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1265, Solar panels catch fire and destroy three buildings in Harby, 31 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1265 | 2024 | Solar panels catch fire and destroy three buildings in Harby | 31 km | Significant |
| EIR-1552 | 2023 | Fire starts in solar panels on commercial roof in Doncaster | 38 km | Significant |
| EIR-0764 | 2024 | Transformer smoking at solar farm in Burton Pedwardine | 40 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 49.9 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Enso Energy Limited
- Owner
- Priory Energy Limited
- Location
- Land North And South Tuxford Road Skegby, Nottinghamshire, NG23, United Kingdom
- Planning authority
- Newark and Sherwood
- Planning application
- 21/01577/FULM
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 21/01577/FULM, with what the planning evidence pack adds for this site.
Every application in Newark and Sherwood · Alerts for applications and incidents near here
Timeline
- 16 July 2021 Planning application submitted
- 16 December 2021 Planning permission granted
- 16 December 2024 Planning permission expired
Incidents on the register at this site
None found. The register holds no published incident that names Tuxford Road Solar Farm. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Tuxford Road Solar Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Tuxford Road Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Tuxford Road Solar Farm?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 6 April 2022.
- Where is Tuxford Road Solar Farm?
- 9.2 km north of Newark on Trent, Nottinghamshire, United Kingdom (postcode NG23).