Planning pack for this site, £295Other options

Battery storage · United Kingdom

Tuxford Road Solar Farm

Operator Enso Energy Limited · Owner Priory Energy Limited

Awaiting ConstructionData checked 16 November 2026Source record dated 4 March 2021

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Tuxford Road Solar Farm is a battery storage site 9.2 km north of Newark on Trent, Nottinghamshire, United Kingdom. Its planning application (21/01577/FULM) went to Newark and Sherwood on 16 July 2021 and was granted on 16 December 2021. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 38 other energy sites within 10 km, 13 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

ENSO ENERGY LIMITED (09892057), active, since 2015. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Tuxford Road Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 18 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells18 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool140 kmMajor
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire175 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Co-located with RE)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Enso Energy Limited
Owner
Priory Energy Limited
Location
Land North And South Tuxford Road Skegby, Nottinghamshire, NG23, United Kingdom
Planning authority
Newark and Sherwood
Planning application
21/01577/FULM

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 21/01577/FULM, with what the planning evidence pack adds for this site.

Every application in Newark and Sherwood · Alerts for applications and incidents near here

  • 16 July 2021 Planning application submitted
  • 16 December 2021 Planning permission granted
  • 16 December 2024 Planning permission expired

None found. The register holds no published incident that names Tuxford Road Solar Farm. If you know of one, report it (confidential reports are anonymised).

Has Tuxford Road Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Tuxford Road Solar Farm; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Tuxford Road Solar Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 4 March 2021.
Where is Tuxford Road Solar Farm?
9.2 km north of Newark on Trent, Nottinghamshire, United Kingdom (postcode NG23).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).