Burnfoot East Wind Farm (further extension) is a 10.8 MW wind farm 6.4 km north of Tillicoultry, Clackmannanshire, United Kingdom. Its planning application (17/00026/FULL) went to Clackmannanshire on 30 January 2017 and was granted on 27 March 2019. It has been operating since 1 July 2020. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 15 other energy sites within 10 km, 8 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 11 other sites and 322 energy sites within 40 km for Burnfoot East Wind Farm (further extension)

Members see the sites and incidents around this one, and every record behind them.

WIND PROSPECT DEVELOPMENTS LIMITED (04113951), dissolved, since 2000. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Onshore wind
Capacity
10.8 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Wind Prospect Developments
Owner
Wind Prospect Group Limited
Location
Site West Of Burnfoot Hill, High Street, Tillicoultry, Central, Clackmannanshire, FK13 6A, United Kingdom
Planning authority
Clackmannanshire
Planning application
17/00026/FULL
First operating
2020
Turbines
3, 135 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 17/00026/FULL, with what the planning evidence pack adds for this site.

Every application in Clackmannanshire · Alerts for applications and incidents near here

  • 30 January 2017 Planning application submitted
  • 27 March 2019 Planning permission granted
  • 1 September 2019 Construction started
  • 1 July 2020 Operational

None found. The register holds no published incident that names Burnfoot East Wind Farm (further extension). If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Burnfoot East Wind Farm (further extension) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Burnfoot East Wind Farm (further extension); it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Burnfoot East Wind Farm (further extension)?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 15 February 2024.
Where is Burnfoot East Wind Farm (further extension)?
6.4 km north of Tillicoultry, Clackmannanshire, United Kingdom (postcode FK13 6A).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).