Onshore wind · United Kingdom
Rhodders Wind Farm
Operator EDF/Wind Prospect
Operational12 MWData checked 16 November 2026Source record dated 29 February 2016
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Rhodders Wind Farm is a 12 MW wind farm 6.3 km north-west of Tillicoultry, Clackmannanshire, United Kingdom. Its planning application (11/00299/FULL) went to Clackmannanshire on 7 November 2011 and was granted on appeal on 21 January 2014. It has been operating since 29 February 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 15 other energy sites within 10 km, 8 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Rhodders Wind Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 12 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- EDF/Wind Prospect
- Location
- Site West Of Burnfoot Hill Tillicoultry Clackmannanshire, Clackmannanshire, FK13 6A, United Kingdom
- Planning authority
- Clackmannanshire
- Planning application
- 11/00299/FULL
- Appeal reference
- 13/00001/REFUSE
- First operating
- 2016
- Turbines
- 6
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 11/00299/FULL, with what the planning evidence pack adds for this site.
Every application in Clackmannanshire · Alerts for applications and incidents near here
Timeline
- 7 November 2011 Planning application submitted
- 8 July 2013 Planning permission refused
- 21 January 2014 Planning permission granted
- 21 January 2014 Appeal granted
- 1 August 2015 Construction started
- 29 February 2016 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Rhodders Wind Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Rhodders Wind Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Rhodders Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Rhodders Wind Farm?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 29 February 2016.
- Where is Rhodders Wind Farm?
- 6.3 km north-west of Tillicoultry, Clackmannanshire, United Kingdom (postcode FK13 6A).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).