Onshore wind · United Kingdom

Ballyhanedin Wind Farm

Operator Gaelectric Developments

Awaiting Construction24 MWData checked 16 November 2026Source record dated 26 May 2020

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Ballyhanedin Wind Farm is a 24 MW wind farm 17 km south of Limavady, Co. Derry / Londonderry, United Kingdom. Its planning application (A/2014/0630/F) went to Derry City and Strabane on 15 January 2015 and was granted on 27 April 2017. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 12 other energy sites within 10 km, 10 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

GAELECTRIC DEVELOPMENTS LIMITED (BR015366), closed, since 2011. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Ballyhanedin Wind Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1038, Wind turbine reported to have collapsed in Northern Ireland during severe storm, 36 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-10382017Wind turbine reported to have collapsed in Northern Ireland during severe storm36 kmSignificant
EIR-04222025Wind turbine fire prompts fire service response in Fermanagh64 kmMinor
EIR-11342017Wind turbine tower collapses at Kilgallioch Wind Farm, Ayrshire146 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Capacity
24 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Gaelectric Developments
Location
Lands 650 metres east of 57A Ballyhanedin Road Ballyhanedin 1.5 kilometres north west of Feeny, Co. Derry / Londonderry, United Kingdom
Planning authority
Derry City and Strabane
Planning application
A/2014/0630/F
Turbines
8, 126 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for A/2014/0630/F, with what the planning evidence pack adds for this site.

Every application in Derry City and Strabane · Alerts for applications and incidents near here

  • 15 January 2015 Planning application submitted
  • 27 April 2017 Planning permission granted
  • 27 April 2022 Planning permission expired

None found. The register holds no published incident that names Ballyhanedin Wind Farm. If you know of one, report it (confidential reports are anonymised).

Has Ballyhanedin Wind Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Ballyhanedin Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Ballyhanedin Wind Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 26 May 2020.
Where is Ballyhanedin Wind Farm?
17 km south of Limavady, Co. Derry / Londonderry, United Kingdom.