Onshore wind · United Kingdom
Altahullion
Operator Renewable Energy Systems (RES) & BP Energy
Operational26 MWData checked 16 November 2026Source record dated 23 February 2010
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Altahullion is a 26 MW wind farm 11 km south-west of Limavady, Co. Derry / Londonderry, United Kingdom. Its planning application went to Causeway Coast and Glens on 1 June 2001 and was granted on 1 October 2001. It has been operating since 1 May 2003. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 12 other energy sites within 10 km, 11 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Altahullion changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 26 MW (this record)
- All phases
- 37.7 MW, the phases on the register added up
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Renewable Energy Systems (RES) & BP Energy
- Location
- Alta Hullion DrumDun GivenCo. Londonderry, Co. Derry / Londonderry, United Kingdom
- Planning authority
- Causeway Coast and Glens
- First operating
- 2003
- Turbines
- 20
This record is 26 MW, one part of a site built in phases. With Altahullion Phase II (11.7 MW) the phases on the register add up to 37.7 MW. Altahullion Phase II
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page, with what the planning evidence pack adds for this site.
Every application in Causeway Coast and Glens · Alerts for applications and incidents near here
Timeline
- 1 June 2001 Planning application submitted
- 1 October 2001 Planning permission granted
- 1 May 2003 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Altahullion. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Altahullion had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Altahullion; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Altahullion?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 23 February 2010.
- Where is Altahullion?
- 11 km south-west of Limavady, Co. Derry / Londonderry, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).