Onshore wind · United Kingdom
Altahullion Phase II
Operator B9 Energy & RES
Operational11.7 MWData checked 16 November 2026Source record dated 3 January 2019
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Altahullion Phase II is a 11.7 MW wind farm 9.4 km south of Limavady, Co. Derry / Londonderry, United Kingdom. Its planning application (B/2004/0795/F) went to Causeway Coast and Glens on 22 November 2004 and was granted on 6 April 2006. It has been operating since 1 September 2007. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 17 other energy sites within 10 km, 15 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Altahullion Phase II changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 11.7 MW (this record)
- All phases
- 37.7 MW, the phases on the register added up
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- B9 Energy & RES
- Location
- Altahullion Wind Farm,Dungiven,Co. Londonderry, Co. Derry / Londonderry, United Kingdom
- Planning authority
- Causeway Coast and Glens
- Planning application
- B/2004/0795/F
- First operating
- 2007
- Turbines
- 9
This record is 11.7 MW, one part of a site built in phases. With Altahullion (26 MW) the phases on the register add up to 37.7 MW. Altahullion
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for B/2004/0795/F, with what the planning evidence pack adds for this site.
Every application in Causeway Coast and Glens · Alerts for applications and incidents near here
Timeline
- 22 November 2004 Planning application submitted
- 6 April 2006 Planning permission granted
- 1 December 2006 Construction started
- 1 September 2007 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Altahullion Phase II. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Altahullion Phase II had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Altahullion Phase II; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Altahullion Phase II?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 3 January 2019.
- Where is Altahullion Phase II?
- 9.4 km south of Limavady, Co. Derry / Londonderry, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).