Onshore wind · United Kingdom

Altahullion Phase II

Operator B9 Energy & RES

Operational11.7 MWData checked 16 November 2026Source record dated 3 January 2019

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Altahullion Phase II is a 11.7 MW wind farm 9.4 km south of Limavady, Co. Derry / Londonderry, United Kingdom. Its planning application (B/2004/0795/F) went to Causeway Coast and Glens on 22 November 2004 and was granted on 6 April 2006. It has been operating since 1 September 2007. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 17 other energy sites within 10 km, 15 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 1 other site and 154 energy sites within 40 km for Altahullion Phase II

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
11.7 MW (this record)
All phases
37.7 MW, the phases on the register added up
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
B9 Energy & RES
Location
Altahullion Wind Farm,Dungiven,Co. Londonderry, Co. Derry / Londonderry, United Kingdom
Planning authority
Causeway Coast and Glens
Planning application
B/2004/0795/F
First operating
2007
Turbines
9

This record is 11.7 MW, one part of a site built in phases. With Altahullion (26 MW) the phases on the register add up to 37.7 MW. Altahullion

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for B/2004/0795/F, with what the planning evidence pack adds for this site.

Every application in Causeway Coast and Glens · Alerts for applications and incidents near here

  • 22 November 2004 Planning application submitted
  • 6 April 2006 Planning permission granted
  • 1 December 2006 Construction started
  • 1 September 2007 Operational

None found. The register holds no published incident that names Altahullion Phase II. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Altahullion Phase II had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Altahullion Phase II; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Altahullion Phase II?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 3 January 2019.
Where is Altahullion Phase II?
9.4 km south of Limavady, Co. Derry / Londonderry, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).