Wolf Bog Wind Farm is a 8.8 MW wind farm 7.9 km north-west of Ballyclare, Co. Antrim, United Kingdom. Its planning application (G/2004/1532/F) went to Mid and East Antrim on 1 May 2004 and was granted on 2 November 2005. It has been operating since 1 November 2007. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 18 other energy sites within 10 km, 12 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Wolf Bog Wind Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 8.8 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- B9 Energy & RES
- Location
- Wolf Bog, Tildarg, nr Ballyclare, Co. Antrim, Co. Antrim, United Kingdom
- Planning authority
- Mid and East Antrim
- Planning application
- G/2004/1532/F
- First operating
- 2007
- Turbines
- 5
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for G/2004/1532/F, with what the planning evidence pack adds for this site.
Every application in Mid and East Antrim · Alerts for applications and incidents near here
Timeline
- 1 May 2004 Planning application submitted
- 2 November 2005 Planning permission granted
- 1 November 2007 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Wolf Bog Wind Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Wolf Bog Wind Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Wolf Bog Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Wolf Bog Wind Farm?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 23 February 2010.
- Where is Wolf Bog Wind Farm?
- 7.9 km north-west of Ballyclare, Co. Antrim, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).