Onshore wind · United Kingdom
Slieve Kirk (formerly Glenconway)
Operator Scottish and Southern Energy (SSE)
Operational18.4 MWData checked 16 November 2026Source record dated 12 December 2013
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Slieve Kirk (formerly Glenconway) is a 18.4 MW wind farm 9.7 km south-west of Limavady, Co. Derry / Londonderry, United Kingdom. Its planning application (B/2006/0607/F) went to Causeway Coast and Glens on 15 December 2006 and was granted on 17 February 2009. It has been operating since 7 November 2013. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 12 other energy sites within 10 km, 10 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Slieve Kirk (formerly Glenconway) changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 18.4 MW (this record)
- All phases
- 46 MW, the phases on the register added up
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Scottish and Southern Energy (SSE)
- Location
- Land at Glenconway Hill off Baranailt Road, (Adjacent to Loughermore Forest and north of Altahullion windfarm), Limavady., Co. Derry / Londonderry, United Kingdom
- Planning authority
- Causeway Coast and Glens
- Planning application
- B/2006/0607/F
- First operating
- 2013
- Turbines
- 8
This record is 18.4 MW, one part of a site built in phases. With Slieve Kirk (formerly Altahullion Phase III & Glenconway 2) (27.6 MW) the phases on the register add up to 46 MW. Slieve Kirk (formerly Altahullion Phase III & Glenconway 2)
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for B/2006/0607/F, with what the planning evidence pack adds for this site.
Every application in Causeway Coast and Glens · Alerts for applications and incidents near here
Timeline
- 15 December 2006 Planning application submitted
- 17 February 2009 Planning permission granted
- 14 May 2012 Construction started
- 7 November 2013 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Slieve Kirk (formerly Glenconway). If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Slieve Kirk (formerly Glenconway) had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Slieve Kirk (formerly Glenconway); it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Slieve Kirk (formerly Glenconway)?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 12 December 2013.
- Where is Slieve Kirk (formerly Glenconway)?
- 9.7 km south-west of Limavady, Co. Derry / Londonderry, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).