Stronelairg Wind Farm

Operator Scottish and Southern Energy (SSE)

Operational228 MWData checked 16 November 2026Source record dated 2 January 2019

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Stronelairg Wind Farm is a 228 MW wind farm 43 km south-west of Inverness, Highland, United Kingdom. Its planning application (EC00005242) went to Scottish Government (S36) on 29 June 2012 and was granted on 6 June 2014. It has been operating since 11 December 2018. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 5 other energy sites within 10 km, 4 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 48 other sites and 69 energy sites within 40 km for Stronelairg Wind Farm

Members see the sites and incidents around this one, and every record behind them.

7 Oct4 Nov
WholesaleBalancing mechanism

Full revenue and market view The pounds behind each bar, any period back to 2021, where it ranks against every site like it, who trades it, and a side-by-side with any other site.

30 settled days to 4 Nov: 21,735 MWh, running 70% of half hours, peak 41 MW of 228, load factor 13%. Members see what that output was worth at the market index price, half hour by half hour, and the rate per MW a year.

A day out costs this site about £211,014 at its earnings over the last 30 settled days (wholesale at the market index price). A figure from the market, not a claim: what the site earned, averaged, is what a day out forgoes.

Contains BMRS data © Elexon Limited copyright and database right (datasets B1610 and MID, the interim settlement run). Read each morning; a settled figure can be revised in later runs.

Technology
Onshore wind
Capacity
228 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Scottish and Southern Energy (SSE)
Location
located approximately 11 kilometres to the south-east of Fort Augustus, Highland, United Kingdom
Planning authority
Scottish Government (S36)
Planning application
EC00005242
First operating
2018
Turbines
66, 135 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for EC00005242, with what the planning evidence pack adds for this site.

Every application in Scottish Government (S36) · Alerts for applications and incidents near here

  • 29 June 2012 Planning application submitted
  • 6 June 2014 Planning permission granted
  • 20 April 2017 Construction started
  • 11 December 2018 Operational

None found. The register holds no published incident that names Stronelairg Wind Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Stronelairg Wind Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Stronelairg Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Stronelairg Wind Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 2 January 2019.
Where is Stronelairg Wind Farm?
43 km south-west of Inverness, Highland, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).