Onshore wind · United Kingdom
Bhlaraidh (previously Balmacaan)
Operator Scottish and Southern Energy (SSE)
Operational110 MWData checked 16 November 2026Source record dated 3 April 2018
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Bhlaraidh (previously Balmacaan) is a 110 MW wind farm 36 km south-west of Inverness, Highland, United Kingdom. Its planning application went to Scottish Government (S36) on 29 June 2012 and was granted on 17 January 2014. It has been operating since 15 September 2017. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 3 other energy sites within 10 km, 2 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Bhlaraidh (previously Balmacaan) changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
Outage notices at this site
2 planned or unplanned unavailability notices published under REMIT, 12 Oct 2026 to 26 Nov 2026, 1 live now. Members see each notice: planned or unplanned, the capacity out, the dates and the cause given.
Contains BMRS data © Elexon Limited copyright and database right. Read each morning; a notice can be withdrawn or revised by the operator.
What this site did, from settlement data
Full revenue and market view The pounds behind each bar, any period back to 2021, where it ranks against every site like it, who trades it, and a side-by-side with any other site.
28 settled days to 4 Nov: 5,417 MWh, running 48% of half hours, peak 54 MW of 110, load factor 7%. Members see what that output was worth at the market index price, half hour by half hour, and the rate per MW a year.
A day out costs this site about £52,788 at its earnings over the last 28 settled days (wholesale at the market index price). A figure from the market, not a claim: what the site earned, averaged, is what a day out forgoes.
Contains BMRS data © Elexon Limited copyright and database right (datasets B1610 and MID, the interim settlement run). Read each morning; a settled figure can be revised in later runs.
The site
- Technology
- Onshore wind
- Capacity
- 110 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Scottish and Southern Energy (SSE)
- Location
- Near Invermoriston, Highland, United Kingdom
- Planning authority
- Scottish Government (S36)
- First operating
- 2017
- Turbines
- 32, 135 m to tip
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page, with what the planning evidence pack adds for this site.
Every application in Scottish Government (S36) · Alerts for applications and incidents near here
Timeline
- 29 June 2012 Planning application submitted
- 17 January 2014 Planning permission granted
- 1 March 2016 Construction started
- 15 September 2017 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Bhlaraidh (previously Balmacaan). If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Bhlaraidh (previously Balmacaan) had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Bhlaraidh (previously Balmacaan); it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Bhlaraidh (previously Balmacaan)?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 3 April 2018.
- Where is Bhlaraidh (previously Balmacaan)?
- 36 km south-west of Inverness, Highland, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).