Onshore wind · United Kingdom
Smulgedon
Operator Gaelectric Developments
Abandoned16.1 MWData checked 16 November 2026Source record dated 19 December 2017
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Smulgedon is a 16.1 MW wind farm 12 km south-east of Limavady, Co. Derry / Londonderry, United Kingdom. Its planning application (B/2009/0070/F) went to Causeway Coast and Glens on 18 February 2009 and was granted on 2 October 2012. Its status in the Renewable Energy Planning Database (UK government) is abandoned. There are 16 other energy sites within 10 km. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Smulgedon changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The company behind this site
GAELECTRIC DEVELOPMENTS LIMITED (BR015366), closed, since 2011. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
The site
- Technology
- Onshore wind
- Capacity
- 16.1 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Abandoned
- Operator or applicant
- Gaelectric Developments
- Location
- Land located at Smulgedon Hill, south of Legavallon Road, approx. 9km to the north-east of Dungiven, and 8km west of Garvagh, Co Londonderry, Co. Derry / Londonderry, United Kingdom
- Planning authority
- Causeway Coast and Glens
- Planning application
- B/2009/0070/F
- Turbines
- 7
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for B/2009/0070/F, with what the planning evidence pack adds for this site.
Every application in Causeway Coast and Glens · Alerts for applications and incidents near here
Timeline
- 18 February 2009 Planning application submitted
- 2 October 2011 Planning permission expired
- 2 October 2012 Planning permission granted
Incidents on the register at this site
None found. The register holds no published incident that names Smulgedon. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Smulgedon had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Smulgedon; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Smulgedon?
- Abandoned, in the Renewable Energy Planning Database (UK government), where it last changed on 19 December 2017.
- Where is Smulgedon?
- 12 km south-east of Limavady, Co. Derry / Londonderry, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).