Planning pack for this site, £295Other options

Onshore wind · United Kingdom

Power Generation Development in Claudy

Operator Tree Top Farms

Awaiting Construction0.3 MWData checked 16 November 2026Source record dated 10 July 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Power Generation Development in Claudy is a 0.3 MW wind farm 17 km south-east of Derry, Co. Derry & Strabane, United Kingdom. Its planning application (LA11/2022/0873/F) went to Causeway Coast and Glens on 15 September 2022 and was granted on 12 June 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 14 other energy sites within 10 km, 12 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Power Generation Development in Claudy sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1038, Wind turbine reported to have collapsed in Northern Ireland during severe storm, 36 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-10382017Wind turbine reported to have collapsed in Northern Ireland during severe storm36 kmSignificant
EIR-04222025Wind turbine fire prompts fire service response in Fermanagh60 kmMinor
EIR-11342017Wind turbine tower collapses at Kilgallioch Wind Farm, Ayrshire151 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Capacity
0.3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Tree Top Farms
Location
Lands 215m South West of 334 Longland Road, Claudy, Co. Derry & Strabane, BT47 4AJ, United Kingdom
Planning authority
Causeway Coast and Glens
Planning application
LA11/2022/0873/F
Turbines
1

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for LA11/2022/0873/F, with what the planning evidence pack adds for this site.

Every application in Causeway Coast and Glens · Alerts for applications and incidents near here

  • 15 September 2022 Planning application submitted
  • 12 June 2026 Planning permission granted
  • 12 June 2031 Planning permission runs out

None found. The register holds no published incident that names Power Generation Development in Claudy. If you know of one, report it (confidential reports are anonymised).

Has Power Generation Development in Claudy had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Power Generation Development in Claudy; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Power Generation Development in Claudy?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 10 July 2026.
Where is Power Generation Development in Claudy?
17 km south-east of Derry, Co. Derry & Strabane, United Kingdom (postcode BT47 4AJ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).