← Back to Somerset

Solar · United Kingdom

Aller Farm

Operator TGC Renewables

Appeal Refused4.7 MWData checked 16 November 2026Source record dated 5 February 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Aller Farm is a 4.7 MW solar farm 13 km south-east of Minehead, Somerset, United Kingdom. Its planning application (3/28/14/005) went to Somerset on 24 September 2014 and was refused on appeal on 22 January 2016. Its status in the Renewable Energy Planning Database (UK government) is appeal refused. There are 11 other energy sites within 10 km, 7 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 29 other sites and 256 energy sites within 40 km for Aller Farm

Members see the sites and incidents around this one, and every record behind them.

TGC RENEWABLES LTD (07499954), dissolved, since 2011. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
4.7 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Appeal Refused
Operator or applicant
TGC Renewables
Location
Land at Aller Farm, East of Woodford and North of Monnksilver, Williton, Somerset, TA4 4HH, United Kingdom
Planning authority
Somerset
Planning application
3/28/14/005
Appeal reference
APP/H3320/W/15/3025089

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 3/28/14/005, with what the planning evidence pack adds for this site.

Every application in Somerset · Alerts for applications and incidents near here

  • 24 September 2014 Planning application submitted
  • 2 April 2015 Planning permission refused
  • 7 July 2015 Appeal lodged
  • 22 January 2016 Appeal refused

None found. The register holds no published incident that names Aller Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Aller Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Aller Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Aller Farm?
Appeal Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 5 February 2016.
Where is Aller Farm?
13 km south-east of Minehead, Somerset, United Kingdom (postcode TA4 4HH).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).