Solar · United Kingdom
Abp Border Control Post Building, Queens Road - Solar Photovoltaic Panel
Operator Associated British Ports
Awaiting Construction0.4 MWData checked 16 November 2026Source record dated 16 October 2023
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Abp Border Control Post Building, Queens Road - Solar Photovoltaic Panel is a 0.4 MW solar farm on the edge of Immingham, Lincolnshire, United Kingdom. Its planning application (DM/0823/23/PNSOL) went to North East Lincolnshire on 17 August 2023 and was granted on 9 October 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 57 other energy sites within 10 km, 30 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Abp Border Control Post Building, Queens Road - Solar Photovoltaic Panel changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
ASSOCIATED BRITISH PORTS (ZC000195), active. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Abp Border Control Post Building, Queens Road - Solar Photovoltaic Panel sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1552, Fire starts in solar panels on commercial roof in Doncaster, 56 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1552 | 2023 | Fire starts in solar panels on commercial roof in Doncaster | 56 km | Significant |
| EIR-1175 | 2026 | Rooftop solar panel fire guts NHS mental health ward in Malton | 71 km | Significant |
| EIR-0764 | 2024 | Transformer smoking at solar farm in Burton Pedwardine | 73 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 0.4 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Associated British Ports
- Location
- Abp Border Control Post Building, Queens Road, Immingham, Grimsby, Lincolnshire, DN40 2QW, United Kingdom
- Planning authority
- North East Lincolnshire
- Planning application
- DM/0823/23/PNSOL
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for DM/0823/23/PNSOL, with what the planning evidence pack adds for this site.
Every application in North East Lincolnshire · Alerts for applications and incidents near here
Timeline
- 17 August 2023 Planning application submitted
- 9 October 2023 Planning permission granted
Incidents on the register at this site
None found. The register holds no published incident that names Abp Border Control Post Building, Queens Road - Solar Photovoltaic Panel. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Abp Border Control Post Building, Queens Road - Solar Photovoltaic Panel had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Abp Border Control Post Building, Queens Road - Solar Photovoltaic Panel; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Abp Border Control Post Building, Queens Road - Solar Photovoltaic Panel?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 16 October 2023.
- Where is Abp Border Control Post Building, Queens Road - Solar Photovoltaic Panel?
- On the edge of Immingham, Lincolnshire, United Kingdom (postcode DN40 2QW).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).