← Back to Lincolnshire
Planning pack for this site, £295Other options

Battery storage · United Kingdom

ECOSTA (Netherlands Way - Battery Energy Facility)

Operator Volta Energy Group · Owner Ecostor 1 Immingham Ltd

Awaiting Construction80 MWData checked 16 November 2026Source record dated 19 January 2022

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

ECOSTA (Netherlands Way - Battery Energy Facility) is a 80 MW battery storage site on the edge of Immingham, Lincolnshire, United Kingdom. Its planning application (DM/0762/21/FUL) went to North East Lincolnshire on 10 August 2021 and was granted on 6 January 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 60 other energy sites within 10 km, 14 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for ECOSTA (Netherlands Way - Battery Energy Facility) sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 83 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells83 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool183 kmMajor
EIR-01092025Fire in single battery unit at Thurrock BESS under construction240 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
80 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Volta Energy Group
Owner
Ecostor 1 Immingham Ltd
Location
Netherlands Way, Immingham, Grimsby, Lincolnshire, DN41 8DF, United Kingdom
Planning authority
North East Lincolnshire
Planning application
DM/0762/21/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for DM/0762/21/FUL, with what the planning evidence pack adds for this site.

Every application in North East Lincolnshire · Alerts for applications and incidents near here

  • 10 August 2021 Planning application submitted
  • 6 January 2022 Planning permission granted
  • 6 January 2025 Planning permission expired

None found. The register holds no published incident that names ECOSTA (Netherlands Way - Battery Energy Facility). If you know of one, report it (confidential reports are anonymised).

Has ECOSTA (Netherlands Way - Battery Energy Facility) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names ECOSTA (Netherlands Way - Battery Energy Facility); it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of ECOSTA (Netherlands Way - Battery Energy Facility)?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 19 January 2022.
Where is ECOSTA (Netherlands Way - Battery Energy Facility)?
On the edge of Immingham, Lincolnshire, United Kingdom (postcode DN41 8DF).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).