← Back to Lincolnshire
Planning pack for this site, £295Other options

Battery storage · United Kingdom

Immingham (Europa Way - Battery Storage Facility)

Operator Newton Energi Limited · Owner Limejump Virtual 5 Limited

Awaiting Construction80 MWData checked 16 November 2026Source record dated 10 June 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Immingham (Europa Way - Battery Storage Facility) is a 80 MW battery storage site on the edge of Immingham, Lincolnshire, United Kingdom. Its planning application (DM/0484/24/FUL) went to North East Lincolnshire on 29 November 2024 and was granted on 20 May 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 60 other energy sites within 10 km, 14 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

NEWTON ENERGI LIMITED (10199022), active, since 2016. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Immingham (Europa Way - Battery Storage Facility) sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 83 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells83 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool183 kmMajor
EIR-01092025Fire in single battery unit at Thurrock BESS under construction240 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
80 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Newton Energi Limited
Owner
Limejump Virtual 5 Limited
Location
1 Adj Europa Way, Grimsby, Lincolnshire, DN41 8DS, United Kingdom
Planning authority
North East Lincolnshire
Planning application
DM/0484/24/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for DM/0484/24/FUL, with what the planning evidence pack adds for this site.

Every application in North East Lincolnshire · Alerts for applications and incidents near here

  • 29 November 2024 Planning application submitted
  • 20 May 2025 Planning permission granted
  • 20 May 2030 Planning permission runs out

None found. The register holds no published incident that names Immingham (Europa Way - Battery Storage Facility). If you know of one, report it (confidential reports are anonymised).

Has Immingham (Europa Way - Battery Storage Facility) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Immingham (Europa Way - Battery Storage Facility); it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Immingham (Europa Way - Battery Storage Facility)?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 10 June 2025.
Where is Immingham (Europa Way - Battery Storage Facility)?
On the edge of Immingham, Lincolnshire, United Kingdom (postcode DN41 8DS).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).