← Back to Gwent

Energy sites / United Kingdom / Gwent

Onshore wind · United Kingdom

ANP Newport Wind Turbine

Operational2.3 MWChecked 6 October 2026Last changed in the dataset 24 October 2016

Technology
Onshore wind
Capacity
2.3 MW
Status
Operational
Operator or applicant
Associated British Ports
Location
Land To South Of South Dock, Alexandra Docks, And Adjacent to River Usk, East Way Road, Gwent, NP20 2UW, United Kingdom
Planning authority
Newport
Planning application
15/0839
First operating
2016
Turbines
2, 126 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

  • 24 July 2015 Planning application submitted
  • 30 September 2015 Planning permission granted
  • 31 March 2016 Construction started
  • 15 August 2016 Operational

None found. The register holds no published incident that names ANP Newport Wind Turbine. If you know of one, report it (confidential reports are anonymised).

The register holds 54 incidents at onshore wind farms in the United Kingdom, 22 of them fires, and 297 worldwide. Counts of incidents in published reporting, not rates.

What fails at onshore wind farms

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.