Planning pack for this site, £295Other options

Battery storage · United Kingdom

Uskmouth Extension

Operator UES ASSET 1 LIMITED · Owner Ues Asset 1 Limited

Awaiting Construction85.8 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Uskmouth Extension is a 85.8 MW battery storage site 5 km south-east of Newport, United Kingdom. Its status in the public dataset is awaiting construction. There are 56 other energy sites within 10 km, 17 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

UES ASSET 1 LIMITED (15242796), active, since 2023. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Uskmouth Extension sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0058, Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire, 74 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire74 kmSignificant
EIR-02492026Smoke and fire incident at Battery Box, Pinhoe Road, Exeter97 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool205 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Battery)
Capacity
85.8 MW
Capacity figure from
Capacity Market register (EMR Delivery Body)
Status
Awaiting Construction (Capacity Market unit, delivery year 2029)
Operator
UES ASSET 1 LIMITED
Owner
Ues Asset 1 Limited
Location
NP18 2BZ, United Kingdom

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Uskmouth Extension. If you know of one, report it (confidential reports are anonymised).

Has Uskmouth Extension had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Uskmouth Extension; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Uskmouth Extension?
Awaiting Construction, in the public dataset.
Where is Uskmouth Extension?
5 km south-east of Newport, United Kingdom (postcode NP18 2BZ).

The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).