← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Onshore wind · Pembrokeshire

Wear Point

Operational8.2 MWApplication 09/0544/PASubmitted 2 October 2009Granted 25 May 2010

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
09/0544/PA
Planning authority
Pembrokeshire
County or area
Dyfed
Nation
Wales
Technology
Onshore wind
Capacity
8.2 MW
Status
Operational
Operator or applicant
John Laing Environmental Assets Group
Location
Land at Wear Point, Waterston Industrial, Llanstadwell
Turbines
4
First operating
2014
  • 2 October 2009 Planning application submitted
  • 25 May 2010 Planning permission granted
  • 30 June 2012 Construction started
  • 7 July 2014 Operational

The pack for this site lists 43 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0874, Turbine blade detaches at RWE's Brechfa Forest West wind farm in Wales, 58 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-08742026Turbine blade detaches at RWE's Brechfa Forest West wind farm in Wales58 kmSignificant
EIR-07942022Wind turbine collapses at Pant-y-Wal wind farm near Gilfach Goch106 kmSignificant
EIR-07902022Nordex attributes a Welsh wind turbine collapse to an overspeed condition108 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 40 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near Wear Point is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Pembrokeshire.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.