Tydd Solar Farm

Application Refused25 MWApplication H19-0329-24Submitted 15 April 2024Refused 9 May 2025

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
H19-0329-24
Planning authority
Powys
County or area
Cambridgeshire
Nation
England
Technology
Solar
Capacity
25 MW
Status
Application Refused (Planning Permission Refused)
Operator or applicant
Pathfinder Clean Energy UK Dev Limited
Location
E/O Guanockgate Road, Sutton St Edmund, Spalding, Wisbech, PE13 4PL
  • 15 April 2024 Planning application submitted
  • 9 May 2025 Planning permission refused

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1155, Rooftop solar fire contained on a Peterborough warehouse roof, 25 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-11552024Rooftop solar fire contained on a Peterborough warehouse roof25 kmSignificant
EIR-07642024Transformer smoking at solar farm in Burton Pedwardine42 kmMinor
EIR-12622024Fire reported on solar-panel roof at Fitzwilliam College auditorium55 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near PE13 4PL is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Powys.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.