Battery storage · United Kingdom

Tydd Solar Farm

Operator Pathfinder Clean Energy UK Dev Limited

Application Refused15 MWData checked 16 November 2026Source record dated 2 June 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Tydd Solar Farm is a 15 MW battery storage site 5.9 km north-west of Wisbech, Cambridgeshire, United Kingdom. Its planning application (H19-0329-24) went to Powys on 15 April 2024 and was refused on 9 May 2025. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 58 other energy sites within 10 km, 25 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

The operator's 26 other sites and 317 energy sites within 40 km for Tydd Solar Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Battery storage (Stand-alone Storage)
Capacity
15 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Refused (Planning Permission Refused)
Operator or applicant
Pathfinder Clean Energy UK Dev Limited
Location
E/O Guanockgate Road, Sutton St Edmund, Spalding, Wisbech, Cambridgeshire, PE13 4PL, United Kingdom
Planning authority
Powys
Planning application
H19-0329-24

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for H19-0329-24, with what the planning evidence pack adds for this site.

Every application in Powys · Alerts for applications and incidents near here

  • 15 April 2024 Planning application submitted
  • 9 May 2025 Planning permission refused

None found. The register holds no published incident that names Tydd Solar Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Tydd Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Tydd Solar Farm; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Tydd Solar Farm?
Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 2 June 2025.
Where is Tydd Solar Farm?
5.9 km north-west of Wisbech, Cambridgeshire, United Kingdom (postcode PE13 4PL).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).