← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · Perth and Kinross

Shire-End Farm

Awaiting Construction17 MWApplication 14/02077/FLLSubmitted 11 December 2014Granted 18 February 2016

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
14/02077/FLL
Planning authority
Perth and Kinross
Nation
Scotland
Technology
Solar
Capacity
17 MW
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Qair Scotland Limited
Location
Shire-End Farm, Forgandenny, Perth, Tayside, PH2 9DR
  • 11 December 2014 Planning application submitted
  • 18 February 2016 Planning permission granted
  • 18 February 2019 Planning permission expired

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1238, Leak from solar heating system at Carnegie Leisure Centre Dunfermline, 22 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12382019Leak from solar heating system at Carnegie Leisure Centre Dunfermline22 kmMinor
EIR-14762026House fire reported to have started on solar panels in Carnoustie53 kmSignificant
EIR-20162022Solar panel fire evacuates Hawick High School103 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near PH2 9DR is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Perth and Kinross.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.