Planning pack for this site, £295Other options

Solar · United Kingdom

Shire-End Farm

Operator Qair Scotland Limited

Awaiting Construction17 MWData checked 16 November 2026Source record dated 24 February 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Shire-End Farm is a 17 MW solar farm 14 km south of Perth, United Kingdom. Its planning application (14/02077/FLL) went to Perth and Kinross on 11 December 2014 and was granted on 18 February 2016. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 21 other energy sites within 10 km, 3 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Shire-End Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1238, Leak from solar heating system at Carnegie Leisure Centre Dunfermline, 22 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12382019Leak from solar heating system at Carnegie Leisure Centre Dunfermline22 kmMinor
EIR-14762026House fire reported to have started on solar panels in Carnoustie53 kmSignificant
EIR-20162022Solar panel fire evacuates Hawick High School103 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
17 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Qair Scotland Limited
Location
Shire-End Farm, Forgandenny, Perth, Tayside, Perth and Kinross, PH2 9DR, United Kingdom
Planning authority
Perth and Kinross
Planning application
14/02077/FLL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 14/02077/FLL, with what the planning evidence pack adds for this site.

Every application in Perth and Kinross · Alerts for applications and incidents near here

  • 11 December 2014 Planning application submitted
  • 18 February 2016 Planning permission granted
  • 18 February 2019 Planning permission expired

None found. The register holds no published incident that names Shire-End Farm. If you know of one, report it (confidential reports are anonymised).

Has Shire-End Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Shire-End Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Shire-End Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 24 February 2025.
Where is Shire-End Farm?
14 km south of Perth, United Kingdom (postcode PH2 9DR).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).