Onshore wind · United Kingdom
Lochelbank Wind Farm II
Operator RWE npower
Operational9.6 MWData checked 16 November 2026Source record dated 6 June 2011
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Lochelbank Wind Farm II is a 9.6 MW wind farm 10 km south of Perth, Tayside, United Kingdom. Its planning application (4505/00752) went to Perth and Kinross on 25 April 2005 and was granted on appeal on 15 August 2007. It has been operating since 25 May 2011. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 31 other energy sites within 10 km, 9 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Lochelbank Wind Farm II changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 9.6 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- RWE npower
- Location
- North of Glenfarg, Perth, Tayside, Tayside, PH2 9QQ, United Kingdom
- Planning authority
- Perth and Kinross
- Planning application
- 4505/00752
- Appeal reference
- P/PPA/340/491
- First operating
- 2011
- Turbines
- 12
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 4505/00752, with what the planning evidence pack adds for this site.
Every application in Perth and Kinross · Alerts for applications and incidents near here
Timeline
- 25 April 2005 Planning application submitted
- 1 December 2005 Planning permission refused
- 15 August 2007 Planning permission granted
- 15 August 2007 Appeal granted
- 1 August 2010 Construction started
- 25 May 2011 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Lochelbank Wind Farm II. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Lochelbank Wind Farm II had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Lochelbank Wind Farm II; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Lochelbank Wind Farm II?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 6 June 2011.
- Where is Lochelbank Wind Farm II?
- 10 km south of Perth, Tayside, United Kingdom (postcode PH2 9QQ).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).