← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · West Northamptonshire

Rugby Road, Kilsby - Rainsbrook Solar Farm

Awaiting Construction13 MWApplication WND/2022/0243Submitted 14 July 2022Granted 12 April 2023

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
WND/2022/0243
Planning authority
West Northamptonshire
County or area
Warwickshire
Nation
England
Technology
Solar
Capacity
13 MW
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Voltalia Limited
Location
Rugby Road, Kilsby, Rugby, CV21 4PN
  • 14 July 2022 Planning application submitted
  • 12 April 2023 Planning permission granted
  • 12 April 2026 Planning permission expired

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1554, Fire involving solar panels at a Market Harborough house spreads to an adjoining property, 23 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15542026Fire involving solar panels at a Market Harborough house spreads to an adjoining property23 kmSignificant
EIR-15452024Fire involving solar panels on a building under construction in Kettering33 kmMinor
EIR-21512018Sunlight reflected from a shed solar panel believed to have started a house fire in Thurnby Lodge34 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near CV21 4PN is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in West Northamptonshire.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.